Cost guide · Updated November 2026

How Much Does a Bathroom Remodel Cost?

A bathroom remodel can mean anything from a new vanity to a full gut renovation, so prices vary more than almost any other project.

Typical range

$6,651–$17,658

National average

$12,151

Source: HomeAdvisor, accessed October 2026. Actual prices depend on your home, materials and location.

A contractor measuring a tiled shower stall in a bathroom

Common prices

ItemTypical costWhat it covers
Half bath / powder room remodel$2,000–$10,000Project total
Full bath remodel$6,000–$15,000Project total
Primary bath remodel$10,000–$40,000Project total
Tub-to-shower conversionAbout $4,100 averageProject total
Prefab shower kit (product)$500–$1,000Product only
Glass shower doorAbout $950Installed
Vanity$300–$3,800Product only
Toilet$100–$1,500Product only
Exhaust fan installationAbout $400Installed
Full demolition$1,000–$3,000Add-on
Licensed plumber$50–$150 per hourLabor only
Permits$100–$1,000Fee

What the labels mean: Project total typical total for the whole job · Product only materials or the product itself, no installation · Installed materials and labor · Add-on priced separately from the main job · Labor only installation labor, no materials · Fee permit, inspection or service fee. Permits, removal of old materials and finishing work are included only where a row says so.

Example budgets

These examples show how the published figures add up for common projects. They are arithmetic on the national ranges above, not quotes.

Cosmetic refresh, small hall bath

$2,000–$10,000

Paint, new vanity and top, toilet, faucet, mirror, lighting and fan. Tub and tile stay. Uses the half-bath range because the scope is similar: no plumbing moves and little demolition.

Full remodel, standard 5×8 bath

$6,000–$15,000

Gut to the studs, new tub or shower, tile, vanity, toilet and fixtures in the same layout. Published full-bath range.

Shower-only project

About $4,100 average for a tub-to-shower conversion

Remove the tub, add a shower pan or base, walls and a glass door. A prefab kit ($500–$1,000 for the product) costs less than a tiled shower; custom tile and niches cost more.

Primary bath with layout changes

$10,000–$40,000

Larger room, double vanity, separate shower and tub. Moving the toilet, shower drain or walls pushes you toward the top of the range or past it.

Scope choices that change the price

Close view of shower tile, mounted fixtures and vanity finish details in a modest bathroom
  • Cosmetic refresh or full renovation. A refresh keeps the tub, tile and plumbing where they are and replaces what you see and touch. A full renovation removes everything to the studs, which exposes hidden damage but lets you fix waterproofing, wiring and ventilation properly.
  • Same layout or moved plumbing. Keeping the toilet, tub and sink in place is the biggest single way to control cost. Moving a toilet drain or shower drain can mean opening the floor and, on a slab, cutting concrete.
  • Prefab or tiled shower. Acrylic and fiberglass shower kits install quickly and have few seams. Tiled showers cost more and take longer because the waterproofing, pan and tile are built in layers on site.

What affects the price

  • Size of the room. A half bath and a primary suite are different projects. More square footage means more tile, fixtures and labor.
  • Labor. Labor is often 40% to 65% of the total, and more when plumbing has to move.
  • Finishes. Tile, vanities and fixtures range from budget to luxury and can swing the price by thousands.
  • Your location. Contractors in large metro areas usually charge more than in rural areas.

Costs that are often left out

  • Rot and subfloor damage. Slow leaks around toilets and tubs often rot the subfloor. It is only visible once the old floor is up, so ask how repairs will be priced if it is found.
  • Waterproofing. Tile is not waterproof on its own. Ask what membrane or system goes behind the tile and in the shower pan, and whether it is included.
  • Ventilation. Many older bathrooms have no fan or one vented into the attic. A properly ducted fan (about $400 installed) protects the new finishes from moisture.
  • Electrical updates. Code may require GFCI protection and a dedicated circuit once walls are opened. This is often priced separately.
  • Fixtures you supply. If you buy the vanity, faucet or tile yourself, confirm who is responsible if something arrives damaged or the wrong size.

How long it takes

A small cosmetic job often takes 2–3 weeks. Projects that move plumbing or change the layout can take up to about 3 months, according to HomeAdvisor.

Upkeep after the job

  • Grout and caulk. Reseal cement grout periodically and replace cracked caulk at tub and shower joints to keep water out of the walls.
  • Run the fan. Run the exhaust fan during and after showers to limit mold and peeling paint.

Questions to ask before you hire

  • What is included in demolition and haul-away?
  • Which waterproofing system will you use behind the tile and in the shower?
  • How will you price rot, mold or subfloor repairs if you find them?
  • Is the plumbing and electrical work done by licensed trades, and who pulls the permits?
  • What are the allowances for tile, vanity and fixtures, and what happens if I choose something over the allowance?
  • Get at least three quotes. Prices for the same job often vary a lot between contractors.
  • Compare the same scope. Make sure each quote covers the same materials, removal, permits and cleanup.
  • Check license and insurance. Ask for proof of insurance and look up the contractor's license with your state.
  • Get it in writing. A written estimate should list the work, the price, the payment schedule and the warranty.

Keep reading

Sources

Prices are national figures published by the sources above and are for general information only. Example budgets multiply those published ranges by the quantities shown. They are not a quote or an offer from FixFinch or any contractor.