Project Completion and Final Walkthrough Checklists
The final walkthrough is your last chance to get things fixed while the crew is still on the job. Walk through with the contractor, write down anything that needs attention (a punch list), and hold the final payment until it is done.
Every project
- Final inspection passed, if a permit was required; get a copy.
- Punch list written, agreed and dated.
- All debris, materials and dumpsters removed; yard and driveway clean.
- Warranty documents for products and workmanship, in writing.
- Manuals, leftover materials (for future repairs) and paint colors.
- Final lien waivers from the contractor and major suppliers or subcontractors.
- Final invoice matches the contract plus approved change orders (change orders).
Bathroom
- Run every faucet, shower and tub; check hot water and drainage.
- Look under the sink and around the toilet for drips after use.
- Check caulk lines, grout and tile for gaps, cracks or lippage (uneven tile edges).
- Shower door closes and seals; fan runs and vents outside.
- GFCI outlets trip and reset.
Windows
- Every window opens, closes and locks smoothly.
- No gaps between frame and wall inside or out; exterior caulk and trim complete.
- Glass labels and stickers removed; no scratches or broken seals.
- Screens installed; weep holes clear.
- Warranty registration confirmed.
Roofing
- Yard, gutters and driveway swept for nails (magnetic sweep).
- Flashing at chimneys, walls and vents looks complete from the ground.
- Gutters reattached and undamaged.
- Attic checked for daylight or new damp spots after the next rain.
- Manufacturer warranty registration and workmanship warranty in hand (roofing warranties).
Flooring
- No gaps, lifting edges, squeaks or hollow spots.
- Transitions secure and level; doors open without rubbing.
- Baseboards and quarter round reinstalled and caulked or filled.
- Leftover boxes of flooring for future repairs.
- Care instructions for the specific product.
Painting
- Check walls in daylight and from an angle for thin spots, drips and roller marks.
- Clean lines at ceilings, trim and corners.
- Outlet covers, switch plates and hardware reinstalled; no paint on them.
- No paint on floors, windows or fixtures.
- Labeled touch-up paint left behind.